Meet TAI - Industrial AI grounded in your digital twin
Platform · New module

Every drawing, on the equipment.

Engineering drawings and P&IDs linked to the exact asset in the twin: read by TAI, tied to the 3D, and connected to everything around them.

P&ID · Linked to twin
Tap a symbol → the 3D jumps to that asset

The drawing and the real asset, one click apart.

Your P&IDs, schematics and engineering drawings hold how the plant is actually built, but they sit in flat PDFs, disconnected from the equipment. Finding the right sheet, then the right symbol, then the real asset, is slow and error-prone.

Engineering reads those drawings with TAI, ties every symbol to the exact asset in the 3D twin, and links each asset to everything around it, so the drawing, the equipment, and its full context sit together.

TAI-read
Tags & symbols detected automatically
3D
Every symbol tied to the exact asset
1 graph
Per asset: sensors, work orders, hazards, docs
1 click
Drawing and real asset, side by side

Drawings that connect to everything.

Three ways engineering drawings come alive on the twin.

01

Linked to 3D

Every symbol, tied to the twin. Tap a symbol on the P&ID and the twin moves to that equipment, so the drawing and the real asset sit side by side, one click apart.

  • Tap a symbol → jump to the asset
  • Drawing and 3D, side by side
  • Read on desktop, tablet or AR
02

Upload & detect

Upload a sheet, TAI finds the tags. Drop in a PDF and every page becomes a diagram sheet. TAI scans it at high resolution, detects the tags and symbols, and proposes a match for each one, which you approve or correct.

  • PDF pages become diagram sheets
  • TAI detects tags & symbols
  • Approve or correct each match
03

Relationships

See what connects to what. Every asset carries its own graph: sensors, work orders, hazards, procedures, the sheets it appears on, and the equipment feeding it upstream, so you can see what a change affects before you make it.

  • A live graph per asset
  • Sensors, work orders, hazards & docs
  • See upstream and downstream impact

Put every drawing on the asset.

Link your P&IDs and drawings to the exact equipment in the twin, and connect each asset to everything around it.

We use cookies to improve your experience and analyse site traffic. Cookie policy.

DeclineAllow